87 WOBA 2030 Competition, Current

The project to increase the density of the WOBA 1930 site is both a self-assured prototype in the tradition of modern founder’s estates and a significant building block in the urban fabric. Within the context of Hans Bernoulli’s development plan, existing outdoor space qualities are further developed, existing spatial offerings are complemented in a contemporary manner, and two new buildings are designed as sustainable, adaptive structures. Emerging from a multi-stage, collective workshop process led by the City of Basel and the Cantonal Heritage Preservation Authority, the project establishes a new clarity of urban design within this complex context. The shift in scale between the two-storey show homes and the four-storey townhouses on the neighbouring plot should not be seen as a break with the site, but rather as a logical continuation and updating of its heterogeneous character.

The model housing estate, built in 1930, comprises 13 houses, all featuring a uniform design and fittings that were considered progressive for their time. It addressed the shortage of affordable, family-friendly housing through a systematic approach and the promise of ‘New Living’. To mark its centenary, it is being expanded with the ‘WOBA 2030’ extension. Whilst the existing development makes full use of the site’s floor area, the extension consistently seeks to build upwards. The tall building balances external factors (such as the specific noise situation and the angles at which light falls on the neighbouring properties) with the internal logic of a sufficient, long-term flexible structure. Spanning ten storeys, it gives rise to new prototypical forms of living and complementary facilities. The building’s public façade emerges from the geometry of the site and turns invitingly towards the city.

1st prize ex aequo with Kollektive Architekt
Collaborative workshop process: Stefan Wülser +, Kollektive Architekt, 8000.agency, Wallimann Reichen, Atelier Neume


Architecture: Architektur: Stefan Wülser + Moritz Wahl Clemens Krüger + Maria Gisler + Emanuel Bosonnet
+ Kollektive Architekt
Landscape: Studio Céline Baumann + META Landschaftsarchitektur

 
(close)
stefanwuelser_kollektive_a-7632
stefanwuelser_kollektive_a-7628
woba-stefanwuelser-kollektive-7943
woba-stefanwuelser-kollektive-7944
woba-stefanwuelser-kollektive-7950
woba1930
stefanwuelser_kollektive_woba2030_sit-hist
woba1930x
woba2030_sw-ka_situationsplan
woba2030_sw-ka_p1-ansicht
woba2030_sw-ka_p1-schnitt
woba2030_sw-ka_p1_niv-00-eg
woba2030_sw-ka_p1_niv-01bis04-unten
woba2030_sw-ka_p1_niv-05bis09-oben
woba2030_sw-ka_p2_schnitt
woba2030_sw-ka_p2_niv-00
woba2030_sw-ka_p2_niv-01
woba2030_sw-ka_p2_niv-02
woba2030_sw-ka_p2_niv-03
woba2030_sw-ka_p2_niv-04
woba1930wbw-001
woba1930wbw-002
woba1930wbw-003
woba1930wbw-004
woba1930wbw-005
woba1930wbw-006
woba1930wbw-007
woba1930wbw-008
woba1930wbw-009
woba1930wbw-010
woba2030_sw-ka_p1_02
woba2030_sw-ka_p1_12
woba2030_sw-ka_p1_05
woba2030_sw-ka_p1_03
woba2030_sw-ka_p1_04
woba2030_sw-ka_p1_09
woba2030_sw-ka_p1_14
woba2030_sw-ka_p2_3
woba2030_sw-ka_p2_1
woba2030_sw-ka_p2_5
woba2030_sw-ka_p2_2